Posted by Derek Perzylo on June 17, 2015

Condominium Complex

Work that was done:

  • 6″ continuous eavestrough around the whole condo complex.
  • Downspouts, both standard and “flip up”.
  • Used 3″ x 3″ large downspouts for maximum drainage.
  • Use of man-lift required.

During our three working days on the site we removed and replaced over 1,000 ft of eavestrough and downspouts. The old material was recycled, where appropriate, and the new eavestroughs were installed and slope-tested to ensure proper drainage.

 

In General, Previous Work